Inspector Lual Chol Ayat

Inspector Lual Chol Ayat Your problems are solved

02/01/2022

We really thank out security of NBGs for there are no more crimes this year compare to last year

15/09/2021

Why are sucide so common nowadays in South Sudan Northern Bahr Ghazal

20/07/2021
Meat testing is under mine  all over the world! this is Serious  you need to be Ware About meat testing
17/03/2020

Meat testing is under mine all over the world! this is Serious you need to be Ware About meat testing

01/02/2020

Rules and Regulation of inspector Lual Chol

Become thoroughly familiar with contract document requirements, applicable codes and standards, approved submittals, and all instructions or clarifications issued by the design professional.

Generally, act as liaison between the contractor and the design professional.

Keep a log of written communications including submittals received from or issued to the contractor.

As appropriate to the nature and extent of construction, monitor the quality and quantity of the work and promptly report to the design professional nonconforming work or nonconforming work performance.

Prepare a daily report recording:
Inspector's time and activities on the project.
Weather conditions.
Nature and location of work being performed and by whom.
Number of workers by trade.
Oral instructions and interpretations given by the design professional.
Specific observations on results of oral instructions and interpretations.
Any occurrence or work which might result in a claim for a change in the contract sum or contract time.
Names of visitors, their titles, and the time and purpose of their visit.
This report shall be prepared for each normal workday or for each day on which the contractor performs work, and a copy shall be promptly sent to the design professional and the University.

Observe testing and inspection done by the contractor as required in the contract documents and coordinate and observe special testing and inspection when requested by the design professional or University.

Monitor the contractor's proposed schedule and the actual construction schedule and promptly report to the design professional discrepancies between the schedules and any conditions which may cause construction delays.

Periodically photograph the work, paying special attention to portions of the work that have been or may be rejected or may be associated with a claim or delay.

Review in detail the contractor's Application for Payment and report the findings of this review to the design professional.
thanks,
yours in faith
Inspector Lual Chol Ayat

01/02/2020
27/01/2020
I welcome Each and  everyone you here to this page
15/10/2019

I welcome Each and everyone you here to this page

08/10/2019

I Found out lawyers in south sudan spend a great deal of their shoveling smoke.whenever you wish to do anything against the law, cicely alway consult a good solicitor first.

08/10/2019

Work hard for what you want because it Won't come to you without a fight, you have to be strong and couragerous and know that you can do anything you put your mind to if samething puts you down or criticize you,keep on believing in yourself and turn it into samething POSITIVE.

29/09/2019

Hi everyone welcome to inspector lual chol

Address

South Sudan NBGs
Juba

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00
Saturday 09:00 - 17:00
Sunday 09:00 - 17:00

Telephone

+211929010088

Alerts

Be the first to know and let us send you an email when Inspector Lual Chol Ayat posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Inspector Lual Chol Ayat:

Share

Category


Other Publishers in Juba

Show All