The cost of power purchased from power plants for the month of June 2024 was Php 151,083,879.29 with the corresponding kwh of 21,432,990.77. The average generation charge of Php7.0491 per kwh. While on July 2024 the cost of power was Php 143,610,345.84 with the corresponding kwh of 19,929,551.00. The average generation charge was Php 7.3160 per kwh. This resulted to an increase of generation billing rates by Php 0.2669 per kwh.
๐๐ฎ๐ฐ๐๐ผ๐ฟ๐ ๐ฎ๐ณ๐ณ๐ฒ๐ฐ๐๐ถ๐ป๐ด ๐๐ต๐ฒ ๐ถ๐ป๐ฐ๐ฟ๐ฒ๐ฎ๐๐ฒ ๐ผ๐ณ ๐๐ข๐ฆ๐ง ๐ข๐ ๐ฃ๐ข๐ช๐๐ฅ
๐ฎ. ๐ ๐ฎ๐๐ฒ๐ฟ๐ถ๐ฎ๐น ๐ถ๐ป๐ฐ๐ฟ๐ฒ๐ฎ๐๐ฒ ๐ถ๐ป ๐๐๐ฒ๐น ๐๐ผ๐๐ ๐ฅ๐ฎ๐๐ฒ
Majority of the contracted Power Supply are fueled by Coal, Diesel and Bunker Oil. This makes SURNECO highly vulnerable to any price increase on imported fuel as it is one of the variable power costs that directly affects any changes in effective generation rate of SURNECO for having direct proportional relationship between fuel cost and effective billing.
๐๐๐ฒ๐น ๐๐ผ๐๐ ๐ฅ๐ฎ๐๐ฒ (๐ฃ๐ต๐ฝ/๐ธ๐ช๐ต)
โข ๐ง๐ฆ๐
June 2024 = 2.8672
July 2024 = 2.9880
Increase = 0.1208
โข ๐๐๐
June 2024 = 2.7352
July 2024 = 2.9250
Increase = 0.1898
โข ๐ก๐๐
June 2024 = 12.2835
July 2024 = 12.2716
Decrease = (0.0119)
๐ฏ. ๐๐ฒ๐ฐ๐ฟ๐ฒ๐ฎ๐๐ฒ ๐ผ๐ณ ๐๐ถ๐น๐น๐ถ๐ป๐ด ๐๐ฒ๐๐ฒ๐ฟ๐บ๐ถ๐ป๐ฎ๐ป๐ ๐๐ป๐ฒ๐ฟ๐ด๐.
The kWh purchased for the previous month serves as divisor on the Cost of Power in computing the monthly billing rate. There is an inverse proportional relationship between kWh purchased and billing rates, since the kwh purchase is the factor that increase or decrease the share in peso per kwh on the Capital Recovery Fee and Fixed O&M. In our August 2024 billing rates, our kWh purchase decreased from 21,432,990.77 kWh for the month of June 2024 to 19,629,551.00 kWh for the month of July 2024. The decrease by 1,803,439.77 kwh contributed to the increase of average generation cost.
๐ฎ. ๐๐ฒ๐๐๐ฎ๐๐ถ๐ผ๐ป ๐ผ๐ณ ๐๐ผ๐น๐น๐ฒ๐ฐ๐๐ถ๐ผ๐ป ๐ผ๐ณ ๐๐ฑ๐ฑ๐ถ๐๐ถ๐ผ๐ป๐ฎ๐น ๐จ๐ป๐ถ๐๐ฒ๐ฟ๐๐ฎ๐น ๐๐ต๐ฎ๐ฟ๐ด๐ฒ ๐ณ๐ผ๐ฟ ๐ ๐ถ๐๐๐ถ๐ผ๐ป๐ฎ๐ฟ๐ ๐๐น๐ฒ๐ฐ๐๐ฟ๐ถ๐ณ๐ถ๐ฐ๐ฎ๐๐ถ๐ผ๐ป.
As per PSALM letter dated July 26, 2024, in view of the expected full recovery of the shortfall in the UC-ME, remittance subsidy for Calendar Years 2013 and 2014 in September 2024 remittance, SURNECO is advised to cease the implementation of the additional UC-ME rate of Php 0.0433/kwh effective August 2424 billing period.
๐ฏ. ๐ข๐ป๐ฒ-๐ ๐ผ๐ป๐๐ต ๐๐บ๐ฝ๐น๐ฒ๐บ๐ฒ๐ป๐๐ฎ๐๐ถ๐ผ๐ป ๐ผ๐ณ ๐ฅ๐ฒ๐ณ๐๐ป๐ฑ ๐๐ผ ๐ ๐ฒ๐บ๐ฏ๐ฒ๐ฟ-๐๐ผ๐ป๐๐๐บ๐ฒ๐ฟ-๐ข๐๐ป๐ฒ๐ฟ๐ ๐ณ๐ผ๐ฟ ๐๐ต๐ฒ ๐ข๐๐ฒ๐ฟ-๐ฅ๐ฒ๐ฐ๐ผ๐๐ฒ๐ฟ๐ ๐ผ๐ณ ๐ฃ๐ฎ๐๐-๐ง๐ต๐ฟ๐ผ๐๐ด๐ต ๐๐ผ๐๐๐ ๐ฎ๐ ๐ผ๐ณ ๐๐๐ป๐ฒ ๐ฎ๐ฌ๐ฎ๐ฐ.
The Pass-Through Costs are the Generation Charge from Power Suppliers, Transmission Charge from NGCP, System Loss Charges, Lifeline Subsidy Charge, and the Senior Citizen Subsidy Charge. Pursuant to ERC resolution no. 14, series of 2022, โA resolution adopting the Revised Rules Governing the Automatic Cost Adjustment and True-Up Mechanisms and Corresponding Confirmation Process for Distribution Utilities,โ with its corresponding โRevised Uniform Reportorial Requirement (URR) Spreadsheet Templateโ, Distribution Utilities like SURNECO is mandated by ERC to implement the Automatic Adjustment of Billing Rates for the Over/Under Recoveries of these pass-on charges.
In the URR Spreadsheet Monitoring Template of ERC, SURNECO was notified that the accumulated over/under recoveries has exceeded the 10% threshold level of the total Non-Network Revenues of the preceding three (3) months billing period. SURNECO has to refund the over-recoveries as of June 2024 with the following schedule of Peso per kwh in the billing month of August 2024 only.
๐๐๐๐ฅ๐๐๐ฆ - ๐ ๐๐๐ก๐๐๐ก๐
โถ ๐๐ฒ๐ป๐ฒ๐ฟ๐ฎ๐๐ถ๐ผ๐ป ๐๐ต๐ฎ๐ฟ๐ด๐ฒ
(Over)/Under Recovery (Php) = (51,515,795.24)
Residential (Peso/kWh) = -2.6752
Low Voltage (Peso/kWh) = -0.0278
Higher Voltage (Peso/kWh) = -26752
โถ ๐ง๐ฟ๐ฎ๐ป๐๐บ๐ถ๐๐๐ถ๐ผ๐ป ๐๐ต๐ฎ๐ฟ๐ด๐ฒ
(Over)/Under Recovery (Php) = (246,918.03)
Residential (Peso/kWh) = -0.0087
Low Voltage (Peso/kWh) = -0.0278
Higher Voltage (Peso/kW) = -4.78
โถ ๐ฆ๐๐๐๐ฒ๐บ ๐๐ผ๐๐ ๐๐ต๐ฎ๐ฟ๐ด๐ฒ
(Over)/Under Recovery (Php) = (4,467,576.79)
Residential (Peso/kWh) = -0.2320
Low Voltage (Peso/kWh) = -0.2320
Higher Voltage (Peso/kWh) = -0.2320
โถ ๐๐ถ๐ณ๐ฒ๐น๐ถ๐ป๐ฒ ๐ฆ๐๐ฏ๐๐ถ๐ฑ๐ ๐๐ต๐ฎ๐ฟ๐ด๐ฒ
(Over)/Under Recovery (Php) = (444,313.79)
Residential (Peso/kWh) = -0.0230
Low Voltage (Peso/kWh) = -0.0230
Higher Voltage (Peso/kWh) = -0.0230
โถ ๐ฆ๐ฒ๐ป๐ถ๐ผ๐ฟ ๐๐ถ๐๐ถ๐๐ฒ๐ป ๐ฆ๐๐ฏ๐๐ถ๐ฑ๐ ๐๐ต๐ฎ๐ฟ๐ด๐ฒ
(Over)/Under Recovery (Php) = 3,275.80
Residential (Peso/kWh) = 0.0002
Low Voltage (Peso/kWh) = 0.0002
Higher Voltage (Peso/kWh) = 0.0002
โถ ๐ง๐ผ๐๐ฎ๐น
(Over)/Under Recovery (Php) = (56,671,328.05)
Residential (Peso/kWh) = -2.9387
Low Voltage (Peso/kWh) = -2.9578
Higher Voltage (Peso/kWh) = -2.9300
Higher Voltage (Peso/kW) = -4.78
๐ง๐ต๐ฒ ๐๐ฎ๐ฏ๐น๐ฒ ๐ฏ๐ฒ๐น๐ผ๐ ๐ถ๐ ๐๐ต๐ฒ ๐ฐ๐ผ๐บ๐ฝ๐ฎ๐ฟ๐ฎ๐๐ถ๐๐ฒ ๐๐๐๐๐๐ง๐๐ฉ๐ ๐๐๐๐๐๐ก๐ ๐ฅ๐๐ง๐๐ฆ ๐ณ๐ผ๐ฟ ๐ ๐ฎ๐ถ๐ป๐น๐ฎ๐ป๐ฑ ๐ฎ๐ป๐ฑ ๐๐๐ฃ๐ ๐ฏ๐ฒ๐ณ๐ผ๐ฟ๐ฒ ๐ฅ๐ฃ๐ง ๐ฎ๐ป๐ฑ ๐๐๐๐ถ๐ป๐ฒ๐๐ ๐ง๐ฎ๐
๐๐ต๐ฎ๐ฟ๐ด๐ฒ:
๐ ๐ฅ๐ฒ๐๐ถ๐ฑ๐ฒ๐ป๐๐ถ๐ฎ๐น
July 2024 = 10.6389/kWh
Aug 2024 = 8.0470/kWh
Decrease = (2.5919/kWh)
๐ข ๐๐ผ๐ ๐ฉ๐ผ๐น๐๐ฎ๐ด๐ฒ
July 2024 = 10.7504/kWh
Aug 2024 = 8.1528/kWh
Decrease = (2.5976/kWh)
๐ญ ๐๐ถ๐ด๐ต๐ฒ๐ฟ ๐ฉ๐ผ๐น๐๐ฎ๐ด๐ฒ
July 2024 = 8.6290/kWh
Aug 2024 = 5.9641/kWh
Decrease = (2.6649/kWh)
๐ญ ๐๐ถ๐ด๐ต๐ฒ๐ฟ ๐ฉ๐ผ๐น๐๐ฎ๐ด๐ฒ
July 2024 = 464.3936/kW
Aug 2024 = 459.9736/kW
Decrease = (4.4200/kW)
๐๐๐๐๐๐ง๐๐ฉ๐ ๐๐๐๐๐๐ก๐ ๐ฅ๐๐ง๐๐ฆ ๐๐ข๐ฅ ๐ ๐๐๐ก๐๐๐ก๐ & ๐๐๐ฃ๐ ๐๐ข๐ก๐ฆ๐จ๐ ๐๐ฅ๐ฆ
Finally, the table below is the effective billing rates after provision of Real Property Tax (RPT) and Business Tax (BT) recoveries in Mainland (On-Grid) Consumers per municipality:
๐บ๏ธ Surigao City (php/kWh)
Residential = 8.0854/kWh
Low Voltage = 8.1912/kWh
Higher Voltage = 6.0025/kWh
๐บ๏ธ Alegria (php/kWh)
Residential = 8.0758/kWh
Low Voltage = 8.1816/kWh
Higher Voltage = 5.9929/kWh
๐บ๏ธ Bacuag (php/kWh)
Residential = 8.0839/kWh
Low Voltage = 8.1897/kWh
Higher Voltage = 6.0010/kWh
๐บ๏ธ Claver (php/kWh)
Residential = 8.0540/kWh
Low Voltage = 8.1598/kWh
Higher Voltage = 5.9711/kWh
๐บ๏ธ Gigaquit (php/kWh)
Residential = 8.0812/kWh
Low Voltage = 8.1870/kWh
Higher Voltage = 5.9983/kWh
๐บ๏ธ Mainit (php/kWh)
Residential = 8.0829/kWh
Low Voltage = 8.1887/kWh
Higher Voltage = 6.0000/kWh
๐บ๏ธ Malimono (php/kWh)
Residential = 8.0880/kWh
Low Voltage = 8.1938/kWh
Higher Voltage = 6.0051/kWh
๐บ๏ธ Placer (php/kWh)
Residential = 8.0830/kWh
Low Voltage = 8.1888/kWh
Higher Voltage = 6.0001/kWh
๐บ๏ธ San Francisco (php/kWh)
Residential = 8.0582/kWh
Low Voltage = 8.1640/kWh
Higher Voltage = 5.9753/kWh
๐บ๏ธ Sison (php/kWh)
Residential = 8.0960/kWh
Low Voltage = 8.2018/kWh
Higher Voltage = 6.0131/kWh
๐บ๏ธ Tagana-an (php/kWh)
Residential = 8.0901/kWh
Low Voltage = 8.1959/kWh
Higher Voltage = 6.0072/kWh
๐บ๏ธ Tubod (php/kWh)
Residential = 8.0568/kWh
Low Voltage = 8.1626/kWh
Higher Voltage = 5.9739/kWh
๐๐ถ๐
๐ฒ๐ฑ ๐๐ต๐ฎ๐ฟ๐ด๐ฒ๐ (๐ฝ๐ต๐ฝ/๐ ๐ผ๐ป๐๐ต)
Residential = 5.6000
Low Voltage = 81.5360
Higher Voltage = 81.5360
๐ ๐ผ๐ป๐๐ต๐น๐ ๐๐ฒ๐บ๐ฎ๐ป๐ฑ ๐๐ต๐ฎ๐ฟ๐ด๐ฒ (๐ฝ๐ต๐ฝ/๐ธ๐ช)
Higher Voltage = 464.7536
๐ ๐ฃ๐น๐ฒ๐ฎ๐๐ฒ ๐ป๐ผ๐๐ฒ ๐๐ต๐ฎ๐ ๐๐ต๐ฒ ๐ ๐ฒ๐บ๐ฏ๐ฒ๐ฟ-๐๐ผ๐ป๐๐๐บ๐ฒ๐ฟ-๐ข๐๐ป๐ฒ๐ฟ๐ (๐ ๐๐ข๐) must be aware that since the refund for Over recovery is only for August 2024, there is a great possibility that the effective billing rates next month will increase equal to the peso per kwh refund of over recovery this August 2024.