About People Magazine

About People Magazine About people - Positive - Inspirational - solution focused. The stories that make the story.

On the 25th Feb a meeting will held at Lismore Worker Club from 2.0 pm - 7.0 pm for people interested in helping at Sept conference and field day 23 to 26 Sept About People Amgazine
• Positive
• Inspirational
• Solution focused
A magazine where sustainability is all about People. The stories that makes story

Living in times of dramatic change creates a need for new out of the box views that is ab

le to adapt to the changes we face and enables us to act outside our current paradigms. The magazine and About People is to present the stories from business, communities and people who are challenging that current view and are forging a new path that moves us toward sustainable futures. This is a magazine of shared values that is to develop trust between all those actively involved and want to participate in those stories. We are about creating change that is positive, inspirational and solution focused. This magazine is about putting aside our differences and focusing on what we have in common.

https://youtu.be/Key8y1yg2yQ
15/11/2022

https://youtu.be/Key8y1yg2yQ

The Western Australien Government has made a tourism ad, and it’s surprisingly honest and informative.👉 Ways you can support us to keep making videos: 🔹 Be...

How are you on this sunny morning in Goonellabah on North Coast NSW?The Team and I are submitting a DA to a Lismore coun...
30/09/2022

How are you on this sunny morning in Goonellabah on North Coast NSW?

The Team and I are submitting a DA to a Lismore council on North Coast NSW end of Oct 2022:
1. 250 prefabricated Xlam as CLT & SIPform passive house-certified homes. On the roofs of buildings, the Tractile, the excess electricity will be stored in the 28.8MW Tesla Batteries Farm.
2. The PV in total 934,370m2 - Tractile tiles 45,000m2 and Arctech Solar Tracking - Tesla PV panel 887,400m2
3. Bi-Charging of EV one per house and 12 charging stations in the shopping centre.
4. Micro-grid that connects to a community of 4800 residents
5. Landscaping the whole site, ensuring enough clearance for the surrounding bush and buildings.
6. We will be trailing the SoMax HTC process.
7. We will have a project at the end of 2024 that will be installed a long-range wireless power transfer. Emrod Tele-Energy Technology.

Some of the Team include:
SIPform™, Tractile, Direct Building Solution, Xlam, Green Product Certification, NB Consulting Engineers, Tesla EV – PV – Powerwall and Arcimoto.

We will employ over 234 consultants and local trades. So, if you live on North Coast NSW, we like to hear by the end of the year.

We will be onsite in July 2023.

We have a video on YouTube at the end of Sept 2022. Then two videos a month project finish the project in 2025. The first YouTube of many
https://youtu.be/J4uIifPI7k0

We will raise AU$500 million by the end of 2025 for the development.

The Team and I Fully Charged LIVE—Sydney 11th to 12th March 2023. I will be there in Sydney. We promoted the project on the film on stand team taking a project and future projects.

Cheers,
Ian Cleland
Sustainable - Urban - Community – Homes
Rethink – Reimagine – Reinvent - Disrupt

The Team and I Fully Charged LIVE—Sydney 11th to 12th March 2023. I will be there in Sydney. We promoted the project on ...
13/07/2022

The Team and I Fully Charged LIVE—Sydney 11th to 12th March 2023. I will be there in Sydney. We promoted the project on the film on stand team taking a project and future projects.

The Team and I are submitting a development application to a Lismore council on North Coast NSW end of August 2022:
1. 250 prefabricated CLT & SIPform passive house certified homes. On the roofs of buildings, the Tractile, the excess electricity will be stored in the 28.8MW Tesla Batteries Farm.
2. The PV in total 934,370m2 - Tractile tiles 45,000m2 and ARCTECH SOLAR TRACKING - Tesla PV panel 887,400m2
3. Bi-Charging of EV one per house and 12 charging stations in the shopping centre.
4. Micro-grid that connects to a community of 4800 residents
5. Landscaping the whole site, ensuring enough clearance for the surrounding bush and buildings.
6. We will be trailing the SoMax HTC process. That processes the sewage into sterilises aggregate for so many products that would carbon released into the atmosphere when State Government and Lismore Council approved the process. https://somaxhtc.com/
7. We have a project at the end of 2024 that will be installed long-range wireless power transfer https://emrod.energy/

At the end of August 2022, they will be posted the video on YouTube.
Some of the Team include:

SipForm, Tractile, Brent Tamati of Direct Building Solution,
. –

Will employ over 234 consultants and local trades. So if you live on North Coast NSW, we like to hear by the end of the year.

We have 900 days to adopt   and   to avoid going beyond1.5 C deg.The Team and I Fully Charged LIVE. Sydney 11th to 12th ...
05/07/2022

We have 900 days to adopt and to avoid going beyond1.5 C deg.

The Team and I Fully Charged LIVE. Sydney 11th to 12th March 2023. Will be there in Sydney. We promoted the project on the film on stand team taking a project and future projects.
The Team and I are submitting a development application to a Lismore council on North Coast NSW end of August 2022:
1. 250 prefabricated CLT & SIPform passive house certified homes. On the roofs of buildings, the Tractile, the excess electricity will be stored in the 28.8MW Tesla Batteries Farm.
2. The PV in total 934,370m2 - Tractile tiles 45,000m2 and ARCTECH SOLAR TRACKING PV 887,400m2
3. Bi-Charging of EV one per house and 12 charging stations in the shopping centre.
4. Micro-grid that connects to a community of 4800 residents
5. Landscaping the whole site, ensuring enough clearance for the surrounding bush and buildings.
6. We will be trailing the SoMax HTC process. That processes the sewage into sterilises aggregate for concrete so many products that would carbon released into the atmosphere when State Government and Lismore Council approved process. https://somaxhtc.com/
7. We have a project at the end of 2024 that will be installed long-range wireless power transfer https://emrod.energy/
At the end of August 2022, they will be posted the video on YouTube.
Ian Cleland - Sustainable-Urban-Community-Homes

https://youtu.be/oanNIpChAiA

Toddington Harper is CEO of Gridserve. A tech-enabled international sustainable energy business. Gridserve develop, build, own and operate solar energy and e...

The Team and I are submitting a development application to a Lismore council on North Coast NSW end of July 2022:1. 250 ...
03/06/2022

The Team and I are submitting a development application to a Lismore council on North Coast NSW end of July 2022:
1. 250 prefabricated CLT & SIPform passive house certified homes. On the roofs of buildings, the Tractile, the excess electricity will be stored in the 28.8MW Tesla Batteries Farm.
2. The PV in total 934,370m2 - Tractile tiles 45,000m2 and ARCTECH SOLAR TRACKING PV 887,400m2
3. Bi-Charging of EV one per house and 12 charging stations located in the shopping centre.
4. Micro-grid that connects to a community of 4800 residents
5. Landscaping the whole site, ensuring enough clearance for the surrounding bush and buildings.
6. We will be trailing the SoMax HTC process. That processes the sewage into sterilises aggregate for concrete so many products that would carbon released into the atmosphere when State Government and Lismore Council approved process.
7. We have a project at the end of 2024 that will be installed long-range wireless power transfer https://emrod.energy/

The cost of 1st stage development is $95-100 million in total. We have interested investors. The Team that assembles onsite and ends in June 2023.
At the end of July 2022, they will be posted the video on YouTube.

The team and I will be at Fully Charged LIVE. Sydney11th to 12th March 2023. We promoted the project on the film on stand team taking a project and future projects.

The team and I are submitting a development application to a Lismore council on North Coast NSW end of July 2022:1. 250 ...
15/05/2022

The team and I are submitting a development application to a Lismore council on North Coast NSW end of July 2022:
1. 250 prefabricated CLT & SIPform passive house certified homes. On the roofs of buildings will be stored the electricity of the 28.8MW Tesla Batteries Farm.
2. The PV in total 934,370m2 - Tractile tiles 45,000m2 and ARCTECH SOLAR TRACKING PV 887,400m2
3. Bi-Charging of EV one per house and 12 charging stations located in the shopping centre.
4. Micro-grid that connects to a community of 4800 residents
5. Landscaping the whole site, ensuring enough clearance for the surrounding bush and buildings.
6. We are trailing the SoMax HTC process. That processes the sewage into sterilises aggregate for concrete so many products that would carbon released into the atmosphere when State Government and Lismore Council.
The cost of 1st stage development is $95-100 million in total. We have interested investors. The Team that assembles onsite and ends in June 2023.
At the end of July 2022, they will be posted the video on YouTube.
The team and I will be at Fully Charged LIVE. Sydney11th to 12th March 2023. We promoted the project on the film on stand team taking a project and future projects.
Regards,
Ian Cleland
Sustainable-Urban-Community-Homes

The team and I are submitting a development application to a Lismore council on North Coast NSW end of July 2022:• 250 p...
07/05/2022

The team and I are submitting a development application to a Lismore council on North Coast NSW end of July 2022:
• 250 prefabricated CLT & SIPform passive house certified homes. On the roofs of homes 45,460m2, 1970m2 shopping centre PV, the electricity will be aggregated and stored in a central hub of the Tesla batteries farm.
• The 934,370m2 PV Tractile tiles producing 26,829,264kw/hr/day along with 887,400m2 Solar tracking PV. They will store the electricity in Tesla Battery Farm
• Bi-Charging of Electrical Vehicles one per house and 12 charging stations located in the shopping centre.
• Micro-grid that connects to locale community of 4800 residents and growing. The potential whole of Lismore of Australia.
• Landscaping the whole site, ensuring enough clearance for the surrounding bush and buildings.
The cost of 1st stage development is $74-80 million in total. We have interested investors. The Team that assembles and ends in June 2023 is the future of land development.

On the 6th from 8.00 pm to 9.00 pm June, we zoom meeting with the team and future TEAM. Are you interested in joining? The exact date I am organising

The team will construct starting next year June/July 2023. When the council approves the developments. Then construct 11...
06/04/2022

The team will construct starting next year June/July 2023. When the council approves the developments. Then construct 113 for 1st stage by beginning 2024 and finished by end 2025.

It will provided passive houses SIPform, 18,000m2 Tractile PV tiles, 14.4MW/hrs Tesla batteries, 250 for every home bi-direction charger for EV. As well the team will provide a CLT shopping centre 1970m2 Tractile with 12 Tesla super charger.

It will be finished end 2025.
Sustainable - Urban - Community - Homes

 Charge LIVE - Sydney - 11th-12th March 2023
19/01/2022

Charge LIVE - Sydney - 11th-12th March 2023

e-Trrike
19/01/2022

e-Trrike

3D-Printed in 24h, no waste. Price to fall as builds ramp-uphttps://youtu.be/TxO46yjE8dI
28/10/2021

3D-Printed in 24h, no waste. Price to fall as builds ramp-up
https://youtu.be/TxO46yjE8dI

Thanks to new extra-large 3D printers, it’s now possible to print a house with a machine that extrudes a material - usually concrete/cement or a polymer, but...

Talking TESLA with Alex Voigt | Fully Charged PLUShttps://youtu.be/xkT2-LkLBMc
27/10/2021

Talking TESLA with Alex Voigt | Fully Charged PLUS
https://youtu.be/xkT2-LkLBMc

In this episode Robert and Alex discuss Roberts recent trip to Spain and the ease of charging compared to a few years ago, Alex’s recent trip to the enormous...

Electric Vehicle Hints & Tips | Electric Moments with Lease Planhttps://youtu.be/JJrGoSLc8Pk
15/10/2021

Electric Vehicle Hints & Tips | Electric Moments with Lease Plan
https://youtu.be/JJrGoSLc8Pk

If you’re thinking seriously about an electric car or have even put in your order and are waiting for it to arrive, this is the video for you. We talked with...

13/10/2021
FULLY CHARGED LIVE IN Sydney next Oct 2022, EV and Renewable Energy in Sydney
09/09/2021

FULLY CHARGED LIVE IN Sydney next Oct 2022, EV and Renewable Energy in Sydney

POWERED BY THE SUN

Lismore will soon get its first Electric Vehicle (EV) charging station in the heart of the CBD.

Council recently accepted a tender to design and construct a $600,000 ‘Solar Carpark’ in the Clyde Campbell carpark. The infrastructure includes the installation of an architectural ‘butterfly-shaped’ awning, clad with photo-voltaic solar panels and covering 40 carparks. It also includes the installation of two EV fast chargers, making them Lismore’s first.

The solar roof is funded through a $1 million grant provided by the Federal Government’s Drought Communities Program to 52 NSW councils to complete infrastructure and other drought-relief projects.

The sustainable design and shape of the roof is inspired by the native Richmond Birdwing Butterfly. The Birdwing Butterfly vine – the butterfly’s food source – will grow on the shade structure from hanging planter boxes.

The height of the structure means it will not be impacted by flood events.

To find out more about this exciting project, go to the news section of our website at www.lismore.nsw.gov.au

Address

Lismore, NSW

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 6am
Sunday 10:30am - 6am

Alerts

Be the first to know and let us send you an email when About People Magazine posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category