20/05/2024
Urgent requirement
Scaffolder with Tuv
Good rate
Mobilization will be on 23may
For more details plz inbox
exchange information
Urgent requirement
Scaffolder with Tuv
Good rate
Mobilization will be on 23may
For more details plz inbox
Urgent requirement
Aramco certified Scaffolding supervisor
Location: Abqaiq
Joining immediately
Inbox for more details
Urgent required
Aramco certified Scaffolding inspector ( 1nos )
Iqama should be transferable
Card should be valid if any available please inbox
Company is EPC
Electric Safety part 03
1. What is LOTO?
2. What is the use of LOTO?
3. What is GFCI?
4. What is the use of GFCI?
5. What is ELCB?
6. What is the use of ELCB?
7. What is Dead man Switch and where it is used?
8. What are the Safety devices attached with Portable Grinders?
9. What are the electrical hazards?
10. What are the main types of electrical injuries?
11. What is the difference between GFCI and ELCB?
12. What is thermostat?
13. What is thermometer?
14. What Is Anemometer?
15. What Is Cathoding?
Part 02
16. What is Bracket Scaffolding, and where it is used?
Excavation
1. What is Excavation?
2. What are the hazards of Excavation?
3. Which permit is required for Excavation activity?
4. What are the requirements for Excavation activity?
5. What is ECC?
6. Excavated soil should be placed meter away from the edge of Excavation.
7. No mechanical excavation is allowed within meter of any underground service.
8. Equipment and other heavy objects must be kept at least meters away from the edge of the excavation.
Compressed Gas Cylinders
1. What is the Safety device attached with Compressed Gas Cylinders?
2. What are the colours of Compressed Gas Cylinders?
3. What is the colour of Oxygen Hose?
4. What is the colour of Acetylene Hose?
5. What should be the minimum distance between Oxygen gas cylinders and Fuel gas Cylinders?
6. Why Compressed Gas Cylinders are stored only in vertical position?
7. What are the requirements for transporting Compressed Gas Cylinders? ↑
8. What is PPM?
HSE Interview Questions part 01
1. What are the responsibilities of a Safety Officer?
2. What is the purpose of Hazard Identification?
3. What is IDLH?
4. What is walkthrough?
5. What will you check in walkthrough?
6. What is Colour Coding?
7. Suppose you go on site and crane lifting activity is about to start or in progress, so what will you check there?
8. If there is an emergency on site, what will be your actions or what will you do?
Hot work
1. What is hot work?
2. What are hot work requirements?
3. Who is fire watcher?
4. How much time a fire watchman should remain at site after finishing the hot work activity?
5. What should be the maximum distance of Fire Extinguisher from a hot work activity?
6. 5 responsibilities of fire watchman?
Scaffolding
1. What is scaffolding?
2. Types of scaffolding?
3. Parts of scaffolding?
4. What are the hazards of scaffolding?
5. Who can erect the scaffolding?
6. Which permit is required for scaffolding er****on?
7. Who can inspect scaffolding?
8. What are the types of scaffolding Tags?
9. What is the use of Red Tag?
10. What is the use Yellow Tag?
11. What is the use Green Tag?
12. What is Toe board?
13. What is the maximum distance allowed between the planks of Scaffolding?
14. What should be the angle of the Ladder placed or Scaffolding?
↑
15. Ladder should be extended platforpa2 meter above the landing platform?
Saudi Aramco Question for Safety officer/Supervisors
collected this question from allot of candidate plus previous exam paper .SASH ,GI CSM and Scaffold handbook please share with maximum candidates.
110%guaranteed to pass Saudi Aramco exam
Q1. Time limit for preliminary report?
Ans. 24 hours
Q. 2. Where smoking is allowed at site?
Ans. Designated smoking shelter
Q. 3. Specify the required distance for access in excavation?
Ans. 7.5 meters (25 ft.)
Q. 4. What is the basic PPE requirement at Saudi Aramco Site?
Ans. Safety Helmet, Safety Shoes and Safety Glasses
Q. 5. At what Depth an Excavation area can be called as Confined Space?
Ans. 1.2 meter (4 ft.)
Q. 6. Mention the PPE requirement for working at a height?
Ans. Full Body Harness
Q. 7. What is the rating for ladder placement?
Ans. 1.0 meter (3 ft.)
Q. 8. What is the purpose of screw jack?
Ans. For maintaining level for stands of post.
Q. 9. Specify the main components are required for hand rails?
Ans. Top rail, Middle rail and Toe Board
Q. 10. How will prevent the caving excavation?
Ans. Sloping, Shoring and Benching
Q. 11. What safety device is used to prevent HOOK and BOOM to get the angled?
Ans. Anti- two Block
Q. 12. What is required for all 120V single phase 15 & 20 amperes receptacle on construction site that are not
Ans G.F.C.I
Q. 13. What is the smell of H2S?
Ans. Rotten egg smell
Q. 14. What is the main requirement for automatically shutting off the Abrasive Blasting nozzle?
Ans. Dead Man Switch
Q, 15. What condition is required for “Breathing Air” Compressors?
Ans. Third party Certification, Preferably by Saudi Aramco recognized testing Agency.
Q. 16. What is the safety method being used to prevent static electricity build-up?
Ans. Grounding & Bonding
Q. 17. During the situation of H2S emission which is the safest direction to move?
Ans. Across wind or upwind direction
Q. 18. In case of a grinder machine with 10,000 RPM the grinding disk should be higher or lower?
Ans. Higher
Q. 19. Specify the grade of “supplied air hood” or respirator?
Ans. Grade – D
Q. 20. How will you protect cylinder valve?
Ans. Cylinder Cap
Q. 21. How to control a lifting Load?
Ans. Tag line
Q. 22. If a Scaffolding platform is more than six meter who is authorized to inspect the platform?
Ans. SA Supervisor and SA Inspector
Q. 23. What is the PPE requirement in Abrasive blasting?
Ans. Respirator mask, Carting type / filter type
Q. 24. Who will certify the operator of cartridge tool?
Ans. Vendor
Q. 25. What is the PPE requirement for protection of eyes during gas cutting operations?
Ans. Cutting Goggles
Q. 26. At Aramco Site what is the Voltage requirement for power tools?
Ans. 110V.
Q. 27. What is safest distance between a building & Gas storage area?
Ans. 50 Feet
Q. 28. What is the safest distance between flammable gas & combustible?
Ans. 20 feet (6 meters)
Q. 29. What is PPE requirement during grinding operations?
Ans. Face Shield & Safety Glass
Q. 30. What is the mandatory requirement of a Flag Man?
Ans. Reflector Vest, red & Green Flag
Q. 31. In case of scaffolding platform how many types of tags are used and what are their users?
Ans. Red Tag – Danger, Yellow Tag - Incomplete platform use with harness, Green Tag – Safe to use
Q. 32. What is the safest method for preventing an extension ladder from moving or falling?
Ans. (a) Ladder must be secured & (b) someone must hold the ladder
Q. 33. What is the safest way to light the lighter of cutting torch during cutting operations?
Ans. Using a Spark Lighter or Strikers
Q. 34. What document required along with SA certified operators?
Ans. Saudi Arabia government License
Q. 35. When is it allowed to shift mobile scaffolding (a) with man (b) with materials?
Ans. Never
Q. 36. For transportation of flammable materials what type of containers are allowed to be used?
Ans. Metallic containers / Safety Box
Q. 37. When are you allowed to climb on bracing and laggers?
Ans. Never
Q. 38. In case of emergency where should be move?
Ans. To the nearest designated assembly point
PART 11
Q. 1. When can a mobile scaffold be moved with men and materials on the scaffold?
Ans. NO
Q. 2. What should be used to protect the valve of a compressed gas cylinder?
Ans. CYLINDER CAP
Q. 3. What safety equipment, if any, is required for flagman posted along Road ways?
Ans. REFLECTORIZED VEST (RED COLOR FLAG AND GREEN COLOR FLAG)
Q. 4. Scaffolds can be tagged with one (1) of three (3) scaffold tags. Name the tags and colors and what each
tag means?
Ans. Green - for safe to use, Yellow - use with a Fall Body Harness (FBH) and comply a 100% tie-off
required (incomplete scaffold), Red – Dangerous / unsafe to use or DO NOT USE.
Q. 5. What are the main components of a standard scaffold guardrail?
Ans. TOP - RAIL, MIDDLE - RAIL and TOE – BOARD
Q. 6. Any scaffold over 38 meters (125 feet) tall, or any scaffold cantilevered by more than 3 meters (10 feet) or
any scaffold support by hung from one or more outrigger beams are what type of scaffolds?
Ans. SPECIAL SCAFFOLD
Q. 7. Who can certify a worker to use a cartridge operated tool?
Ans. VENDOR
Q. 8. What is required for all 120volt, single phase, 15 and 20 ampere receptacle outlets on construction sites
that area not a part of the permanent wiring system?
Ans. G.F.C.I. (Ground Fault Circuit Interrupter)
Q. 9. What safety device must be present on a grinder to protect the operator from contact with the blade?
Ans. Protective Guard
Q. 10. A scaffold is built over 6 meters (20 feet) high. The scaffold tag shall be signed by whom?
Ans. Scaffold Supervisor and Scaffold inspector
Q. 11. Workers in an excavation have to be within how many meters / feet of an access ladder, stairs, etc.?
Ans. 7.5 meters (25 feet)
Q. 12. What is required to automatically shut off the abrasive blasting nozzle?
Ans. Dead Man Switch
Q. 13. Supplied air for abrasive blasting hood or respirators shall be of what grade of air?
Ans. Grade D
Q. 14. Critical lift plans are required for certain conditions and lifting activities. What are three (3) conditions or
lifting activities?
Ans. 1.) 40 tons and above – Tandem lift, Tale lifting, 2.) Near the power live conductor or wire, 3.) Man
Basket (lifting around hydrocarbon)
Q. 15. What shall be used to control all loads lifted by cranes?
Ans. TAG LINE
Q. 16. All sewers within what distance of a welding / cutting operation shall be covered?
Ans. 23 meters (75 feet)
Q. 17. When a Hydrogen Sulfide (H2S) alarms sound in which direction do you travel to get out of the H2S
hazard zone?
Ans. Up wind or across the wind direction
Q. 18. What color is Hydrogen Sulfide (H2S) gas?
Ans. Colorless
Q. 19. At low concentrations a distinctive odor is given off by H2S gas. What is that odor?
Ans. Rotten egg smell
Q. 20. An angle grinder has a revolution per minute (RPM) speed of 10,000 RPM’s. The grinding disk must
have a higher or lower RPM speed?
Ans. Higher
Q. 21. A crane operation is going to take place and a man – basket is going to be used. Does a Critical Lift Plan
have to be filled out by?
Ans. By Rigger one (1)
Q. 22. Prior to a work permit being issued what must be done?
Ans. Joint site inspection by permit issuer and Permit receiver
Q. 23. For all types of scaffolds what two things shall be filled out?
Ans. Scaffold checklist and Tag
Q. 24. When work must be done on energized electrical equipment what procedure shall be followed?
Ans. Lock-out and Tag- out procedure
Q. 25. Scaffold erected 12. 2 meters (40 feet) or taller shall be erected by whom?
Ans. Saudi Aramco certified scaffolds’ and approved by third party
Q. 26. All confined spaces shall have what / whom outside the confined space?
Ans. 1.) 40 tons and above – Tandem lift, Tale
Ans. Entry Attendant
Q. 27. All lighting equipment in a confined space shall be what type?
Ans. 24 Volts
Q. 28. The minimum living space (meter / feet) for each person in an accommodation is what?
Ans. 4.6 meters
Q. 29. What is the maximum time for preliminary report?
Ans. 24 hours
Q. 30. What is the maximum time for final report?
Ans. 120 hours
Q. 31. How many meters should the ladder excess from the platform?
Ans. One (1) meter or 3 feet
Q. 32. Joint site inspection must be done by whom?
Ans. Issuer and Receiver
Q. 33. Fire having a fuel of combustible materials?
Ans. Oxygen
Q. 34. Switch to be use in the nozzle of sand blasting hose?
Ans. Dead Man Switch
Q. 35. Is it required a rigger in unloading and loading using a boom truck?
Ans. Yes
Q. 36. Where can you find UL / FM?
Ans. From the manufacturer’s guidelines or procedure
Q. 37. Fork of the forklift must be rest at where?
Ans. On the Ground
Q. 38. Is it possible to use the platform attached to the fork of the forklift?
Ans. NO
Q. 39. At what voltage for electrical powered tools?
Ans. 110 Volts
Q. 40. What is the minimum and maximum voltage of lighting equipment in the confined space?
Ans. 24 Volts to 110 Volts
Q. 41. What do you call the stick that used to push the materials to feed on the blade of table sew?
Ans. Push Stick
Q. 42. What is the distance of the spoil from edge of excavation?
Ans. 2 feet
Q. 43. Give the three types of excavation?
Ans. 1.) Slopping, 2.) Shoring and 3.) Benching
Q. 44. In excavation ladders should be provided every. What distance?
Ans. 25 feet
Q. 45. What is LOTO?
Ans. Lock – Out / Tag – Out
Q. 46. What is the boom length of the crane wherein it needs to provide aviation light / aircraft warning device?
Ans. 60 meters
Q. 47. Third party sticker of crane must be inspected every. How many months?
Ans. 3 Months
Q. 48. Third party sticker of man basket / spreader bar and boom lift must be inspected every. How many
months?
Ans. 3 Month
Q. 49. Who will certify to use the cartridge tools?
Ans. Vendor
Q. 50. What is the safe range of Oxygen level?
Ans. 20 to 23.5
Q. 51. What is the maximum load that rigger 3 authorized signal?
Ans. 1,) Upto 10 tons
Q. 52. What is the maximum load that rigger 2 authorized to signal?
Ans. 40 tons
Q. 53. What is the maximum load that rigger 1 authorized to signal?
Ans. 40 tons above
Q. 54. When the red scaffold tag use, and who are authorized to use the red tag?
Ans. Incomplete Scaffold / Certified Erector
Q. 55. Who are the signatories of special scaffold?
Ans. SA Supervisor and SA Inspector
Q. 56. What is the safe distance of the scaffold from the edge of excavation?
Ans. 1.5 meters X depth of excavation
Q. 57. Who inspect the excavation prior to work?
Ans. Certified Civil Engineer
Q. 58. What do you call the rope that used to control the load during lifting?
Ans. Tag Line
Q. 59. How long is the duration of work permit?
Ans. 8 hours
Q. 60. What is the grade of air that supplied to the blasting hood?
Ans. Grade D
Q. 61. What are the requirements for grinding?
Ans. Face Shield and Working Gloves
Q. 62. What are the requirements for fuelling?
Ans. Grounding Rod
Q. 63. In using oxygen / acetylene. What is the required pressure for acetylene?
Ans. 15 per square inches (psi)
Q. 64. And what is the required pressure for oxygen?
Ans. 80 per square inches (psi)
Q. 65. What is the safe distance of heavy equipment from the excavation?
Ans. 1.5 meter X the depth of excavation
Q. 66. What are the four (4) kinds of permit in Saudi Aramco?
Ans. Hot work permit, Cold work permit, Confined Space permit and Release of hazardous chemical
permit.
Q. 67. What are the three types of tagging in scaffold?
Ans. 1.) Red, 2.) Yellow and 3.) Green
Q. 68. What is the wind speed limit during crane lifting?
Ans. 32 KPH
Q. 69. Requirements of scaffold prior to use?
Ans. Scaffold tag and Checklist
Q. 70. How you consider an excavation is a confined space?
Ans. In 1. 2 meters deeper
Q. 71. What are the requirements for Crane operator Aramco project?
Ans. SAG License, letter of Sponsorship Iqama and picture
Q. 72. What is the distance of hot work activities from the sewer / surface drain? Below that distance it needs to
cover the surface drain.
Ans. 23 meters
Q. 73. What is the requirement of the crane prior to use in Saudi Aramco Project?
Ans. Inspection Sticker
Q. 74. What is the wind speed limit during man basket / working platform operation?
Ans. 25 KPH / 15 MPH
Q. 75. What should be the temperature of the foods before it will serve to the employee?
Ans. 60 degrees
Q. 76. What are the requirements for catering employee?
Ans. Health Certificate, Gloves Apron and Hair Net
Q. 77. What is the maximum distance in five (5) minutes of free lifting?
Ans. 12 inches
Q. 78. What is the maximum employee that will use the one unit of washing machine?
Ans. 20 person
Q. 79. What is the maximum dimension / are of accommodation per employee?
Ans. 4.6 square meter
Ans. Hot work permit, Cold work permit, Confined Space permit and Release of hazardous chemical
permit.
Q. 67. What are the three types of tagging in scaffold?
Ans. 1.) Red, 2.) Yellow and 3.) Green
Q. 68. What is the wind speed limit during crane lifting?
Ans. 32 KPH
Q. 69. Requirements of scaffold prior to use?
Ans. Scaffold tag and Checklist
Q. 70. How you consider an excavation is a confined space?
Ans. In 1. 2 meters deeper
Q. 71. What are the requirements for Crane operator Aramco project?
Ans. SAG License, letter of Sponsorship Iqama and picture
Q. 72. What is the distance of hot work activities from the sewer / surface drain? Below that distance it needs to
cover the surface drain.
Ans. 23 meters
Q. 73. What is the requirement of the crane prior to use in Saudi Aramco Project?
Ans. Inspection Sticker
Q. 74. What is the wind speed limit during man basket / working platform operation?
Ans. 25 KPH / 15 MPH
Q. 75. What should be the temperature of the foods before it will serve to the employee?
Ans. 60 degrees
Q. 76. What are the requirements for catering employee?
Ans. Health Certificate, Gloves Apron and Hair Net
Q. 77. What is the maximum distance in five (5) minutes of free lifting?
Ans. 12 inches
Q. 78. What is the maximum employee that will use the one unit of washing machine?
Ans. 20 person
Q. 79. What is the maximum dimension / are of accommodation per employee?
Ans. 4.6 square meter
Q. 92. When is hearing protection required?
Ans. At 85 Decibels
Q. 93. What shall be done prior before signing a permit?
Ans. A joint site inspection should be done by Issuer and Receiver
Q. 94. Original copy of the permit is maintained by the Issuer for how many months?
Ans. 3 month
Q. 95. How is the permit closed?
Ans. Permit is closed by obtaining the signature of the Issuer and the Receiver
Q. 96. What situation can cancel the work permit?
Ans. Any Unscheduled work stoppage or Emergency Condition
Q. 97. Who are responsible for the safety of people and equipment’s in a SA project?
Ans. Issuer and Receiver
Q. 98. Permit can be issued up to a period of 30 days under what condition?
Ans. NO / Hydrocarbons present by division head approval
Q. 99. Is welding allowed on lines containing greater than 23.5 % Oxygen?
Ans. NO
Q. 100. What should be placed outside confined spaces to notify personnel that entry is in progress?
Ans. Signs or barricades shall be placed
Q. 101. Who is allowed to enter into a confined space?
Ans. Only the Trained Person
Q. What should a “Danger, do not Operate” Tag contains?
Ans. Date, Time, Organization, Name, Badge Number, Equipment Name, Phone Contact & Signature of
the Installer
Q. 102. Who can operate an abrasive blasting & coating equipment?
Ans. SA Certified Operator
Q. 103. What is required on the abrasive nozzle?
Ans. Dead Man Switch
Q. 104. What is required while handling chemical on site?
Ans. Chemical Hazard Bulletin (CHB) or Material Safety Data Sheet (MSDS)
Q. 105. Is side loading while crane operations allowed?
Ans. NO
Q. 106. Who should inspect slings, fittings and shackles prior to use?
Ans. SA Certified Rigger
Q. 107. At what wind speed is lifting not allowed?
Ans. Wind Speed above 32 KPH
Q. 108. At what wind speed is crane suspended man basket operation not allowed?
Ans. 25 KPH
Q. 109. When is critical lift plan required, state any three?
Ans. Tandem, Multiple lifts, Night time crane lift and Crane Operations near Power Lines
Q. 110. What shall be placed at Oxygen & Acetylene Cylinder regulators?
Ans. Flashback Arrestors
Q. 111. What is the maximum voltage allowed for portable electrical hand tools?
Ans. 125 Volts
Q. 112. Is a 2
nd person required to guide the operator while moving Man Lift from one place to another place?
Ans. YES
Q. 113. Can we rely on our sense of smell to detect H2S?
Ans. NO
Q. 114. What is the Color of H2s?
Ans. No Color
Q. 115. How we leave the area on hearing an H2S alarm?
Ans. Upwind or Crosswind Direction
Q. 116. Is H2S Heaver than air?
Ans. YES
Q. 117. Who should sign the tags for special scaffold & scaffold taller than 6.0 meter (20 feet)?
Ans. Certified Scaffold Supervisor & Scaffold Inspector
Q. 118. What are the three types of tags in scaffolding & explain each?
Q. An approved specialized scaffold erector can build any type of scaffold?
Ans. YES
Q. 130. Who is allowed to give signals crane operator during lifting operation and what are there categories?
Ans. a.) SA Certified Rigger 111 for loads up to 10 tons.
b.) SA Certified Rigger 11 for loads up to 20 tons
c.) SA Certified Rigger 1 can lift all loads and perform critical lifts.
Q. 131. While lifting a load it is necessary to extend outrigger of the Crane Fully?
Ans. YES
Q. 132. Is Hot Work or Cold Work permit is required with a confined space entry permit according to the job
done?
Ans. YES
Q.133. It is allowed to stand on the top step of step ladders?
Ans. NO
Q. 134. Is it necessary to secure the Boom of the Crane while moving from one end to another end?
Ans. YES
Q. 135. Is all Boom Trucks with loads shall be loaded / unloaded by SA Certified Rigger?
Ans. YES
Q. 136. Timber sills shall be at least minimum how many Centimeters?
Ans. 9 Inch Wide and 1.5 Inch Thick
Q. 137. Temperature of Hot asphalt shall not exceed how many degrees Celsius?
Ans. 232 Degree Celsius
Q. 138. What is the Color of the Nitrogen Cylinder?
Ans. Blue
Q. 139. What is the Color of the Argon Cylinder?
Ans. Gray
Q. 140. What is the Color of the Acetylene Cylinder?
Ans. Yellow
Q. All loads exceeding of the rated load capacity of the crane specific lift?
Ans. 85 %
Q. 141. All sewer within shall be covered prior to work?
Ans. 23 meter (75 feet)
Q. 142. For how many minutes a qualified fire watch shall be maintained during operation?
Ans. 30 minutes
Q. 143. Cutting, Welding and Brazing are not allowed in O2 enriched environments greater than?
Ans. 23. 5 %
Q. 144. Welding cables shall be placed continuous within electrode holder?
Ans. 3 meter (10 feet)
Q. Service vehicles and equipment’s shall not be located closer than, from well head or processing equipment?
Ans. 15 meter (50 feet)
Q. 145. Disable two-way radios and telephones while rigging up and loading perforating guns unless the gun is
at least, how many meters down the hole?
Ans. 152 meters (500 feet)
Q. 146. Qualified personnel authorized to work on electrical circuits shall be trained in?
Ans. First Aid Basic Life Support (BLS)
Q. 147. Secured at least, above impact surface and shall not be refused after stopping a fall?
Ans. 5.6 meters (18 feet)
Q. 148. Personal fall arrest system shall be used on any fixed ladder that is over and not equipped with a cage?
Ans. 6.0 meters (20 feet)
Q. 149. If the work is over, above the ground or working surface long term in nature or require heavy physical
other methods such as scaffolds or personnel lifts shall be used instead of ladder. What is the height required?
Ans. 1.8 meters (6 feet)
Q. 150. Only qualified personnel shall operate elevating work platforms are?
Ans. Man lift – Hydraulic / Scissor telescopic
Q. 151. Special scaffolds or scaffold taller than, how many meters require additional review by SA Consulting
services department / an approved by third party?
Q. 152. For moving of all drums what position using containment pallet, drum rack, basket or with a drum
handling extension?
Ans. Upright position
Q. 153. No drums shall be removed by, between forks?
Ans. Sandwiching
Q. 154. All material handling equipment designed to include, shall be equipped?
Ans. Ropes (Roll over protective structures) e.g. Bulldozer, Loaders and Scrappers.
Q. 155. Personal monitors shall be worn required by local operations procedures in area where H2S
concentrations have been detected at, how many PPM or greater?
Ans. 10 PPM
Q. 156. No entry shall be allowed in atmospheres of?
Ans. 100 PPM
Q. 157. Never attempt to rescue an H2S victim without proper respiratory protection in the form of a?
Ans. Self-Contained Breathing Apparatus (SCBA)
Q. 158. What is the odor threshold that similar to rotten eggs smell, and how much their PPM?
Ans. 0.10 PPM
Q, 159. Eye irritating and threshold limit valve (TLV) time weighed average TWA, how many PPMS?
Ans. 10 PPM
Q. 160. Strong odor pulmonary irritation begins in how many PPM?
Ans. 25 PPM
Q. 161. Severe conjunctivitis with prolonged exposure how many PPM?
Ans. 50 PPM
Q. 162. Severe eye irritation and coughing, loss of sense of smell in to 1 to 5 minutes immediately dangerous to
life or health, how many PPM?
Ans. 100 PPM
Q. 163. For Pulmonary edema and gastrointestinal disturbance are?
Ans. 250 PPM
Q. 164. For dizziness and loss of consciousness possible within 30 minutes area?
Ans. 500 PPM
Q. 165. For immediate unconsciousness and death within a minute are?
Ans. 1000 PPM
Q. 166. Aisles correctly established with, how many centimeter clear widths?
Ans. 76 centimeters (30 inches)
Q. 167. No storage within, how many meter (s) of Ceiling?
Ans. 0.6 meter (2 feet)
Q. 168. Electrical switch panels clear, how many meters?
Ans. 1.0 meter (3feet)
Q. 169. Extension cord’s maximum length in how many meters?
Ans. 3.0 meters (10 feet)
Q. 170. All visitors to Marine Vessels, Barges, and Off - Shore Drilling Rigs shall first report directly to?
Ans. Person – in – charge
Q. 171. The person in charge shall provide all passengers with orientation of the Vessel, Barge or Mobile OO –
Shore Drilling Rig Including what?
Ans. Life Raft and Fire Station
Q. 172. When disembarking from a Vessel or Barge to an OFF – Shore platform or Boat landing do not
disembark until the person – in – charge has given permission to do so?
Ans. YES
Q. 173. Never go outside the Ship’s rail unless authorized by the person in charge?
Ans. YES
Q. 174. In the event that a person falls in the water, immediately shout?
Ans. Assist in the Rescue as directed by the Person – in – charge
Q. 175. Personal baskets shall not be permitted to transfer personal when the wind speed is?
Ans. 25 KPH (14 Knots)
Q. 178. In the case of eye or skin contact promptly flush affected areas with clean water for a prolonged period,
how many minutes to remove contaminated clothing and seeks medical attention?
Ans. 15 minutes
Q. 179. Position (lower) hydraulic crane Booms and secure hook while travelling Yes or No?
Ans. YES
Q. 180. Gas regulators shall be turned off and hoses blew off at the end of shift or task?
Ans. YES
Q. 181. Only strikers shall be used to light a torch, never light a torch with matches or a lighter?
Ans. YES
Q. 182. Acetylene cylinders in use shall have a handle or valve wrench in place at all times?
Ans. YES
Q. 183. Shackles and other connecting devices shall be completely closed bar bolted?
Ans. YES
Q. 184. Drivers shall report all vehicle collision and moving violation immediately, no matter how minor?
Ans. YES
Q. 185. Follow proper guidelines for loading, checking and unloading pyramid or stripped load for SA?
Ans. YES
Q. 186. Forklift shall not be used beyond their capacity?
Ans. YES
Q. 187. Forks shall not be lift in up position while forklift is unattended?
Ans. YES
Q. 188. A field verification of minimum wall thickness and pipe condition shall be conducted a welding on wall
thickness less than, how many centimeter shall not be allowed?
Ans. 0.64 centimeter (0.25 inches)
Q. 189.Scuba equipment shall not be used at depth greater than?
Ans. 45 meters (150 feet)
Q. 190. A diving supervisor is required when 3 or more divers go deeper than?
Ans. 30 meters (100 feet)
Q. 191. A recompression chamber shall be on site for all divers below?
Ans. 18.5 meters (60 feet)
Q. 192. All divers shall possess a fit for diving medical certificate not more than, how many month?
Ans. 12 months
Q. 193. All cofferdams over how many meters deep must be designated by a qualified Engineer?
Ans. 1.2 meter (4 feet)
Q. 194. Barrier and warning signs shall be established at the boundary for safe operation and storage, how many
meters per hour?
Ans. 2 meters / hour
Q. 195. Cabs fitted to equipment must give visibility in how many degrees?
Ans. 360 degrees
Q. 196. Angles not exceeding in how many degrees from vertical?
Ans. 60 degrees
Q. 197. Booms shall be kept in how many meters from overhead power lines up to volts?
Ans. 6.0 meters (20 feet)
Q. 198. Heating operations shall be at least how many meters from fuel gas cylinder, building and other
structures?
Ans. 4.5 meters (15 feet)
Q. 199. Temperature of hot asphalt not exceed in how many *C?
Ans. 232*C (450*F)
Q. 200. An adjustable grinding wheel guard shall cover not less than in how many degrees in circumference?
Ans. 235 degrees
Q. 201. The gap between the tool rest and wheel shall exceed, in how many millimeters?
Ans. 2.6 millimeters (1/8 inches)
Q. 202. The torque guard to wheel space shall not exceed in how many millimeters?
Ans. 5.2 millimeters (1/4 inches)
Q. 203. This device is normally using a caliber cartridge as the driving tastener?
Ans. 0.25 or 0.27
Q. What are the three (3) types of Scaffold?
Ans. 1.) Suspended scaffold, 2.) Underhand scaffold, 3.) Mobile scaffold
Q. 204. How many psi in high pressure airless spray gun?
Ans. 1000 per square inches (psi)
Q. 205. There shall be one suspended scaffold anchor rated at, how many pounds
Ans. 4000 pounds (lbs.)
Q. 206. Independent life line anchor shall be attached to the building or tank or other structure and rated at how
many pounds?
Ans. 5400 pounds (lbs.)
Q. 207. Lift plan shall be approved by what person before the lift?
Ans. Competent person
Q. 208. Planks shall extend minimum at how many centimeters?
Ans. 15 centimeters (6 inches)
Q. 209. Planks shall extend maximum at how many centimeters?
Ans. 30.5 centimeters (12 inches)
Q. 210. Set Top Rail how many centimeters?
Ans. 106 centimeters (42 inches)
Q. 211. Provide Mid Rail how many centimeters high to Toe-board?
Ans. 10 centimeters (4 inches)
Q. 212. Guard Rail should how many pounds form side force?
Ans. 200 pounds (lbs.)
Q. 213. Tie scaffold to solid structures every how many meters vertically?
Ans. 7.9 meters (26 feet)
Q. 214. The scaffold to solid structures every how many meters horizontally?
Ans. 9.1 meters (30 feet)
Q. 215. Guard Rails shall have barrier walls, how many centimeters the wire mesh between the mid rail and the
floor to prevent from falling and striking workers?
Ans. 1 ½ inches
Q. 216. Fall protection is required for unguarded floors and platform at how many meters above?
Ans. 1.8 meters (6.0 feet)
Q. 217. Radio transmitters shall not be allowed in how many meters of electronic detonators unless they are de
energized and effectively locked?
Ans. 33 meters (100 feet)
Q. 218. All excavated Soil to at least how many meters from edge of the trench?
Ans. 0.6 meters (2 feet)
Q. 219. Any sluff of the dirt pile within how many meters of edges shall be removed before entering a Pit?
Ans. 0.6 meters (2 feet)
Q. 220. Type “C” Soil width versus height angle?
Ans. 1.5 to 1 slope (or 34 degrees)
Q. 221. Type “B” Soil rocks and Clay angles at?
Ans. 1 to 1 slope (45 degrees)
Q. 222. Type “A” Soil Clay rock, cohesive angle at?
Ans. ¾ to slope (53 degrees)
Q. 223. Stable Rock is how many degrees?
Ans. 90 degrees or vertical
Q. 224. The frequency of the repeated gas test is?
Ans. At least every two hour or continuously
Q. 225. The Crane capacity based on the load chart is derated by how many %?
Ans. 50 %
Q. 226. Never allow a personnel platform (man basket) crane lift when the wind speed exceeds in how many
KPH?
Ans. 25 KPH
Q. 227. The validity a green tag for the scaffold, how many weeks or days?
Ans. 2 weeks
Q. 228. Keep heavy equipment, scaffold, or vehicles at a distance of at least how many times from the depth of
the excavation for any straight excavation sidewalk?
Ans. 1.5 times
Q. 229. Keep spoil material at least how many meters away from the edge of the excavation?
Ans. 0.6 meters (2 feet)
Q. 230. In case anyone entering a trench to use a ladder, the maximum travel distance to the ladder should not
exceed?
Ans. 7.5 meters (25 feet)
Q. 231. The confined space entry work permit is issued for excavation deeper than how many meters?
Ans. 1.2 meters (4 feet)
Q. 232. All possible anchor points can support a minimum of how many pounds of deadweight?
Ans. 2300 Kilograms (5000 lbs.) / i.e. the same weight of the car
Q. 233. Attach lanyards above shoulder height and in such a way as to restrict the distance a worker could fall
to less than?
Ans. 1.8 meters (6.0 feet)
Q. 234. The clearance of equipment (safe distance) when it is used near an excavation, keep farther away than,
how many times the excavation depth?
Ans. 1.5 times
Q. 235. The written designation for the rigger 1 or a person competent in rigging must be valid for a maximum
of?
Ans. 30 days only
Q. 236. When the wind speeds exceed a consult the cranes manufacturer’s manual and follow the requirements
for high wind operation, what is the required wind speed?
Ans. 32 KPH (20 MPH)
Q. 237. Aircraft warning light working 24 hours a day should be permanently attached to the tip of the crane
booms exceeding in how many Meters?
Ans. 95 meters (311 feet)
Q. 238. When a lift is performed what materials that you use to control the suspended load?
Ans. Tag Line
Q. 239. Cover sewer manhole covers, drains, and so on within how many meters of the work direction in all
directions?
Ans. 23 meters (75 feet)
Q. 240. The frequency of the medical examinations for exposed workers is?
Ans. Every Two (2) years
Q. 241. The exposed workers have regular medical examination including what?
Ans. Chest X-ray and Pulmonary examinations
Q. 242.The exposure limit to ionizing radiation at the barricade boundary is?
Ans. 2.0 MR / Hour
Q. 243. What is the meaning of CHB’s?
Ans. Chemical Hazard Bulletins
Q. 244. Oxygen cylinders are stored at least how many meters from other flammable or corrosive materials?
Ans. 15 meters (50 feet)
Q. 245. Cylinders should not be stored at temperatures exceeding in how many degrees centigrade?
Ans. 54*C (130*F)
Q. 246. All Gas Cylinder have been retested within?
Ans. The past five (5) years
Q. 247. The portable electrical equipment is rated at or below?
Ans. 115 Volts
Q. 248. Using portable electrical tools how many volts is prohibited?
Ans. 220 Volts
Q. 249. UL means?
Ans. Underwriters Laboratories
Q. 250. FM means?
Ans. Factory Mutual
Q. 251. Generators are located at least how many meters from the building or combustible materials?
Ans. 15 meters (50 feet)
Q. 252. The pressure limit for the acetylene hose pressure gauge is?
Ans. 15 psi
Q. 253. What is the General Instruction of work permit system?
Ans. GI 2.100 for work permit system but in personal flotation devices for work over, on or near water is
GI 6.020
Q. 254. What is the General Instruction of Scaffolding activity?
Ans. GI 8.001
Q. 255. What is the General Instruction of Lifting activity?
Ans. GI 7.026
Q. 256. What is the meaning of TUV certificate?
Ans. TECHNISHER UBEWACHUNGS – VEREI
Q. 257. What is the meaning of SGS certificate?
Ans. SOCIETE GENERALE DE SURVEILLANCE
Q. What is Potential Hazard?
Ans. A potential hazard is a hazard that might be there but has not yet made itself apparent. Actually
this is not a very useful phrase, except for people who need weasel words to avoid taking a stand.Saudi Aramco Question for Safety officer/Supervisors
collected this question from allot of candidate plus previous exam paper .SASH ,GI CSM and Scaffold handbook please share with maximum candidates.
110%guaranteed to pass Saudi Aramco exam
Q1. Time limit for preliminary report?
Ans. 24 hours
Q. 2. Where smoking is allowed at site?
Ans. Designated smoking shelter
Q. 3. Specify the required distance for access in excavation?
Ans. 7.5 meters (25 ft.)
Q. 4. What is the basic PPE requirement at Saudi Aramco Site?
Ans. Safety Helmet, Safety Shoes and Safety Glasses
Q. 5. At what Depth an Excavation area can be called as Confined Space?
Ans. 1.2 meter (4 ft.)
Q. 6. Mention the PPE requirement for working at a height?
Ans. Full Body Harness
Q. 7. What is the rating for ladder placement?
Ans. 1.0 meter (3 ft.)
Q. 8. What is the purpose of screw jack?
Ans. For maintaining level for stands of post.
Q. 9. Specify the main components are required for hand rails?
Ans. Top rail, Middle rail and Toe Board
Q. 10. How will prevent the caving excavation?
Ans. Sloping, Shoring and Benching
Q. 11. What safety device is used to prevent HOOK and BOOM to get the angled?
Ans. Anti- two Block
Q. 12. What is required for all 120V single phase 15 & 20 amperes receptacle on construction site that are not
Ans G.F.C.I
Q. 13. What is the smell of H2S?
Ans. Rotten egg smell
Q. 14. What is the main requirement for automatically shutting off the Abrasive Blasting nozzle?
Ans. Dead Man Switch
Q, 15. What condition is required for “Breathing Air” Compressors?
Ans. Third party Certification, Preferably by Saudi Aramco recognized testing Agency.
Q. 16. What is the safety method being used to prevent static electricity build-up?
Ans. Grounding & Bonding
Q. 17. During the situation of H2S emission which is the safest direction to move?
Ans. Across wind or upwind direction
Q. 18. In case of a grinder machine with 10,000 RPM the grinding disk should be higher or lower?
Ans. Higher
Q. 19. Specify the grade of “supplied air hood” or respirator?
Ans. Grade – D
Q. 20. How will you protect cylinder valve?
Ans. Cylinder Cap
Q. 21. How to control a lifting Load?
Ans. Tag line
Q. 22. If a Scaffolding platform is more than six meter who is authorized to inspect the platform?
Ans. SA Supervisor and SA Inspector
Q. 23. What is the PPE requirement in Abrasive blasting?
Ans. Respirator mask, Carting type / filter type
Q. 24. Who will certify the operator of cartridge tool?
Ans. Vendor
Q. 25. What is the PPE requirement for protection of eyes during gas cutting operations?
Ans. Cutting Goggles
Q. 26. At Aramco Site what is the Voltage requirement for power tools?
Ans. 110V.
Q. 27. What is safest distance between a building & Gas storage area?
Ans. 50 Feet
Q. 28. What is the safest distance between flammable gas & combustible?
Ans. 20 feet (6 meters)
Q. 29. What is PPE requirement during grinding operations?
Ans. Face Shield & Safety Glass
Q. 30. What is the mandatory requirement of a Flag Man?
Ans. Reflector Vest, red & Green Flag
Q. 31. In case of scaffolding platform how many types of tags are used and what are their users?
Ans. Red Tag – Danger, Yellow Tag - Incomplete platform use with harness, Green Tag – Safe to use
Q. 32. What is the safest method for preventing an extension ladder from moving or falling?
Ans. (a) Ladder must be secured & (b) someone must hold the ladder
Q. 33. What is the safest way to light the lighter of cutting torch during cutting operations?
Ans. Using a Spark Lighter or Strikers
Q. 34. What document required along with SA certified operators?
Ans. Saudi Arabia government License
Q. 35. When is it allowed to shift mobile scaffolding (a) with man (b) with materials?
Ans. Never
Q. 36. For transportation of flammable materials what type of containers are allowed to be used?
Ans. Metallic containers / Safety Box
Q. 37. When are you allowed to climb on bracing and laggers?
Ans. Never
Q. 38. In case of emergency where should be move?
Ans. To the nearest designated assembly point
PART 11
Q. 1. When can a mobile scaffold be moved with men and materials on the scaffold?
Ans. NO
Q. 2. What should be used to protect the valve of a compressed gas cylinder?
Ans. CYLINDER CAP
Q. 3. What safety equipment, if any, is required for flagman posted along Road ways?
Ans. REFLECTORIZED VEST (RED COLOR FLAG AND GREEN COLOR FLAG)
Q. 4. Scaffolds can be tagged with one (1) of three (3) scaffold tags. Name the tags and colors and what each
tag means?
Ans. Green - for safe to use, Yellow - use with a Fall Body Harness (FBH) and comply a 100% tie-off
required (incomplete scaffold), Red – Dangerous / unsafe to use or DO NOT USE.
Q. 5. What are the main components of a standard scaffold guardrail?
Ans. TOP - RAIL, MIDDLE - RAIL and TOE – BOARD
Q. 6. Any scaffold over 38 meters (125 feet) tall, or any scaffold cantilevered by more than 3 meters (10 feet) or
any scaffold support by hung from one or more outrigger beams are what type of scaffolds?
Ans. SPECIAL SCAFFOLD
Q. 7. Who can certify a worker to use a cartridge operated tool?
Ans. VENDOR
Q. 8. What is required for all 120volt, single phase, 15 and 20 ampere receptacle outlets on construction sites
that area not a part of the permanent wiring system?
Ans. G.F.C.I. (Ground Fault Circuit Interrupter)
Q. 9. What safety device must be present on a grinder to protect the operator from contact with the blade?
Ans. Protective Guard
Q. 10. A scaffold is built over 6 meters (20 feet) high. The scaffold tag shall be signed by whom?
Ans. Scaffold Supervisor and Scaffold inspector
Q. 11. Workers in an excavation have to be within how many meters / feet of an access ladder, stairs, etc.?
Ans. 7.5 meters (25 feet)
Q. 12. What is required to automatically shut off the abrasive blasting nozzle?
Ans. Dead Man Switch
Q. 13. Supplied air for abrasive blasting hood or respirators shall be of what grade of air?
Ans. Grade D
Q. 14. Critical lift plans are required for certain conditions and lifting activities. What are three (3) conditions or
lifting activities?
Ans. 1.) 40 tons and above – Tandem lift, Tale lifting, 2.) Near the power live conductor or wire, 3.) Man
Basket (lifting around hydrocarbon)
Q. 15. What shall be used to control all loads lifted by cranes?
Ans. TAG LINE
Q. 16. All sewers within what distance of a welding / cutting operation shall be covered?
Ans. 23 meters (75 feet)
Q. 17. When a Hydrogen Sulfide (H2S) alarms sound in which direction do you travel to get out of the H2S
hazard zone?
Ans. Up wind or across the wind direction
Q. 18. What color is Hydrogen Sulfide (H2S) gas?
Ans. Colorless
Q. 19. At low concentrations a distinctive odor is given off by H2S gas. What is that odor?
Ans. Rotten egg smell
Q. 20. An angle grinder has a revolution per minute (RPM) speed of 10,000 RPM’s. The grinding disk must
have a higher or lower RPM speed?
Ans. Higher
Q. 21. A crane operation is going to take place and a man – basket is going to be used. Does a Critical Lift Plan
have to be filled out by?
Ans. By Rigger one (1)
Q. 22. Prior to a work permit being issued what must be done?
Ans. Joint site inspection by permit issuer and Permit receiver
Q. 23. For all types of scaffolds what two things shall be filled out?
Ans. Scaffold checklist and Tag
Q. 24. When work must be done on energized electrical equipment what procedure shall be followed?
Ans. Lock-out and Tag- out procedure
Q. 25. Scaffold erected 12. 2 meters (40 feet) or taller shall be erected by whom?
Ans. Saudi Aramco certified scaffolds’ and approved by third party
Q. 26. All confined spaces shall have what / whom outside the confined space?
Ans. 1.) 40 tons and above – Tandem lift, Tale
Ans. Entry Attendant
Q. 27. All lighting equipment in a confined space shall be what type?
Ans. 24 Volts
Q. 28. The minimum living space (meter / feet) for each person in an accommodation is what?
Ans. 4.6 meters
Q. 29. What is the maximum time for preliminary report?
Ans. 24 hours
Q. 30. What is the maximum time for final report?
Ans. 120 hours
Q. 31. How many meters should the ladder excess from the platform?
Ans. One (1) meter or 3 feet
Q. 32. Joint site inspection must be done by whom?
Ans. Issuer and Receiver
Q. 33. Fire having a fuel of combustible materials?
Ans. Oxygen
Q. 34. Switch to be use in the nozzle of sand blasting hose?
Ans. Dead Man Switch
Q. 35. Is it required a rigger in unloading and loading using a boom truck?
Ans. Yes
Q. 36. Where can you find UL / FM?
Ans. From the manufacturer’s guidelines or procedure
Q. 37. Fork of the forklift must be rest at where?
Ans. On the Ground
Q. 38. Is it possible to use the platform attached to the fork of the forklift?
Ans. NO
Q. 39. At what voltage for electrical powered tools?
Ans. 110 Volts
Q. 40. What is the minimum and maximum voltage of lighting equipment in the confined space?
Ans. 24 Volts to 110 Volts
Q. 41. What do you call the stick that used to push the materials to feed on the blade of table sew?
Ans. Push Stick
Q. 42. What is the distance of the spoil from edge of excavation?
Ans. 2 feet
Q. 43. Give the three types of excavation?
Ans. 1.) Slopping, 2.) Shoring and 3.) Benching
Q. 44. In excavation ladders should be provided every. What distance?
Ans. 25 feet
Q. 45. What is LOTO?
Ans. Lock – Out / Tag – Out
Q. 46. What is the boom length of the crane wherein it needs to provide aviation light / aircraft warning device?
Ans. 60 meters
Q. 47. Third party sticker of crane must be inspected every. How many months?
Ans. 3 Months
Q. 48. Third party sticker of man basket / spreader bar and boom lift must be inspected every. How many
months?
Ans. 3 Month
Q. 49. Who will certify to use the cartridge tools?
Ans. Vendor
Q. 50. What is the safe range of Oxygen level?
Ans. 20 to 23.5
Q. 51. What is the maximum load that rigger 3 authorized signal?
Ans. 1,) Upto 10 tons
Q. 52. What is the maximum load that rigger 2 authorized to signal?
Ans. 40 tons
Q. 53. What is the maximum load that rigger 1 authorized to signal?
Ans. 40 tons above
Q. 54. When the red scaffold tag use, and who are authorized to use the red tag?
Ans. Incomplete Scaffold / Certified Erector
Q. 55. Who are the signatories of special scaffold?
Ans. SA Supervisor and SA Inspector
Q. 56. What is the safe distance of the scaffold from the edge of excavation?
Ans. 1.5 meters X depth of excavation
Q. 57. Who inspect the excavation prior to work?
Ans. Certified Civil Engineer
Q. 58. What do you call the rope that used to control the load during lifting?
Ans. Tag Line
Q. 59. How long is the duration of work permit?
Ans. 8 hours
Q. 60. What is the grade of air that supplied to the blasting hood?
Ans. Grade D
Q. 61. What are the requirements for grinding?
Ans. Face Shield and Working Gloves
Q. 62. What are the requirements for fuelling?
Ans. Grounding Rod
Q. 63. In using oxygen / acetylene. What is the required pressure for acetylene?
Ans. 15 per square inches (psi)
Q. 64. And what is the required pressure for oxygen?
Ans. 80 per square inches (psi)
Q. 65. What is the safe distance of heavy equipment from the excavation?
Ans. 1.5 meter X the depth of excavation
Q. 66. What are the four (4) kinds of permit in Saudi Aramco?
Ans. Hot work permit, Cold work permit, Confined Space permit and Release of hazardous chemical
permit.
Q. 67. What are the three types of tagging in scaffold?
Ans. 1.) Red, 2.) Yellow and 3.) Green
Q. 68. What is the wind speed limit during crane lifting?
Ans. 32 KPH
Q. 69. Requirements of scaffold prior to use?
Ans. Scaffold tag and Checklist
Q. 70. How you consider an excavation is a confined space?
Ans. In 1. 2 meters deeper
Q. 71. What are the requirements for Crane operator Aramco project?
Ans. SAG License, letter of Sponsorship Iqama and picture
Q. 72. What is the distance of hot work activities from the sewer / surface drain? Below that distance it needs to
cover the surface drain.
Ans. 23 meters
Q. 73. What is the requirement of the crane prior to use in Saudi Aramco Project?
Ans. Inspection Sticker
Q. 74. What is the wind speed limit during man basket / working platform operation?
Ans. 25 KPH / 15 MPH
Q. 75. What should be the temperature of the foods before it will serve to the employee?
Ans. 60 degrees
Q. 76. What are the requirements for catering employee?
Ans. Health Certificate, Gloves Apron and Hair Net
Q. 77. What is the maximum distance in five (5) minutes of free lifting?
Ans. 12 inches
Q. 78. What is the maximum employee that will use the one unit of washing machine?
Ans. 20 person
Q. 79. What is the maximum dimension / are of accommodation per employee?
Ans. 4.6 square meter
Ans. Hot work permit, Cold work permit, Confined Space permit and Release of hazardous chemical
permit.
Q. 67. What are the three types of tagging in scaffold?
Ans. 1.) Red, 2.) Yellow and 3.) Green
Q. 68. What is the wind speed limit during crane lifting?
Ans. 32 KPH
Q. 69. Requirements of scaffold prior to use?
Ans. Scaffold tag and Checklist
Q. 70. How you consider an excavation is a confined space?
Ans. In 1. 2 meters deeper
Q. 71. What are the requirements for Crane operator Aramco project?
Ans. SAG License, letter of Sponsorship Iqama and picture
Q. 72. What is the distance of hot work activities from the sewer / surface drain? Below that distance it needs to
cover the surface drain.
Ans. 23 meters
Q. 73. What is the requirement of the crane prior to use in Saudi Aramco Project?
Ans. Inspection Sticker
Q. 74. What is the wind speed limit during man basket / working platform operation?
Ans. 25 KPH / 15 MPH
Q. 75. What should be the temperature of the foods before it will serve to the employee?
Ans. 60 degrees
Q. 76. What are the requirements for catering employee?
Ans. Health Certificate, Gloves Apron and Hair Net
Q. 77. What is the maximum distance in five (5) minutes of free lifting?
Ans. 12 inches
Q. 78. What is the maximum employee that will use the one unit of washing machine?
Ans. 20 person
Q. 79. What is the maximum dimension / are of accommodation per employee?
Ans. 4.6 square meter
Q. 92. When is hearing protection required?
Ans. At 85 Decibels
Q. 93. What shall be done prior before signing a permit?
Ans. A joint site inspection should be done by Issuer and Receiver
Q. 94. Original copy of the permit is maintained by the Issuer for how many months?
Ans. 3 month
Q. 95. How is the permit closed?
Ans. Permit is closed by obtaining the signature of the Issuer and the Receiver
Q. 96. What situation can cancel the work permit?
Ans. Any Unscheduled work stoppage or Emergency Condition
Q. 97. Who are responsible for the safety of people and equipment’s in a SA project?
Ans. Issuer and Receiver
Q. 98. Permit can be issued up to a period of 30 days under what condition?
Ans. NO / Hydrocarbons present by division head approval
Q. 99. Is welding allowed on lines containing greater than 23.5 % Oxygen?
Ans. NO
Q. 100. What should be placed outside confined spaces to notify personnel that entry is in progress?
Ans. Signs or barricades shall be placed
Q. 101. Who is allowed to enter into a confined space?
Ans. Only the Trained Person
Q. What should a “Danger, do not Operate” Tag contains?
Ans. Date, Time, Organization, Name, Badge Number, Equipment Name, Phone Contact & Signature of
the Installer
Q. 102. Who can operate an abrasive blasting & coating equipment?
Ans. SA Certified Operator
Q. 103. What is required on the abrasive nozzle?
Ans. Dead Man Switch
Q. 104. What is required while handling chemical on site?
Ans. Chemical Hazard Bulletin (CHB) or Material Safety Data Sheet (MSDS)
Q. 105. Is side loading while crane operations allowed?
Ans. NO
Q. 106. Who should inspect slings, fittings and shackles prior to use?
Ans. SA Certified Rigger
Q. 107. At what wind speed is lifting not allowed?
Ans. Wind Speed above 32 KPH
Q. 108. At what wind speed is crane suspended man basket operation not allowed?
Ans. 25 KPH
Q. 109. When is critical lift plan required, state any three?
Ans. Tandem, Multiple lifts, Night time crane lift and Crane Operations near Power Lines
Q. 110. What shall be placed at Oxygen & Acetylene Cylinder regulators?
Ans. Flashback Arrestors
Q. 111. What is the maximum voltage allowed for portable electrical hand tools?
Ans. 125 Volts
Q. 112. Is a 2
nd person required to guide the operator while moving Man Lift from one place to another place?
Ans. YES
Q. 113. Can we rely on our sense of smell to detect H2S?
Ans. NO
Q. 114. What is the Color of H2s?
Ans. No Color
Q. 115. How we leave the area on hearing an H2S alarm?
Ans. Upwind or Crosswind Direction
Q. 116. Is H2S Heaver than air?
Ans. YES
Q. 117. Who should sign the tags for special scaffold & scaffold taller than 6.0 meter (20 feet)?
Ans. Certified Scaffold Supervisor & Scaffold Inspector
Q. 118. What are the three types of tags in scaffolding & explain each?
Q. An approved specialized scaffold erector can build any type of scaffold?
Ans. YES
Q. 130. Who is allowed to give signals crane operator during lifting operation and what are there categories?
Ans. a.) SA Certified Rigger 111 for loads up to 10 tons.
b.) SA Certified Rigger 11 for loads up to 20 tons
c.) SA Certified Rigger 1 can lift all loads and perform critical lifts.
Q. 131. While lifting a load it is necessary to extend outrigger of the Crane Fully?
Ans. YES
Q. 132. Is Hot Work or Cold Work permit is required with a confined space entry permit according to the job
done?
Ans. YES
Q.133. It is allowed to stand on the top step of step ladders?
Ans. NO
Q. 134. Is it necessary to secure the Boom of the Crane while moving from one end to another end?
Ans. YES
Q. 135. Is all Boom Trucks with loads shall be loaded / unloaded by SA Certified Rigger?
Ans. YES
Q. 136. Timber sills shall be at least minimum how many Centimeters?
Ans. 9 Inch Wide and 1.5 Inch Thick
Q. 137. Temperature of Hot asphalt shall not exceed how many degrees Celsius?
Ans. 232 Degree Celsius
Q. 138. What is the Color of the Nitrogen Cylinder?
Ans. Blue
Q. 139. What is the Color of the Argon Cylinder?
Ans. Gray
Q. 140. What is the Color of the Acetylene Cylinder?
Ans. Yellow
Q.141. All loads exceeding of the rated load capacity of the crane specific lift?
Ans. 85 %
Be the first to know and let us send you an email when Aramco scaffolding supervisor & Inspector posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.
Want your business to be the top-listed Media Company?